Analysis of the Impact of Landslides and Floods on Train Travel Graph Operation Patterns and Signaling Systems on the Mandai-Garongkong Line

Authors

  • Nazul Muhadzdzib Politeknik Perkeretaapian Indonesia, Madiun, Indonesia
  • Mohamad Lukman Hakim PT Celebes Railway Indonesia, Makassar, Indonesia
  • Nathanael Tegar Putra Nugraha PT Celebes Railway Indonesia, Makassar, Indonesia
  • Arief Darmawan Politeknik Perkeretaapian Indonesia, Madiun, Indonesia

DOI:

https://doi.org/10.38035/sjam.v3i1.427

Keywords:

Floods, Landslides, Signalling, Train Travel Graph

Abstract

Floods and landslides are natural disasters that have a major impact on transportation modes, especially in the land transportation sector. As a result of the disaster, many land travel routes were hampered and in the case of the railway sector, it had a very significant impact. The existence of floods and landslides resulted in the train operating system not running properly. This study aims to analyze the impact of floods and landslides on Train Travel Graph operating patterns and the effect on the railway signaling system by using the scoring method to obtain the results of mapping the level of flood and landslide risk and qualitative methods by analyzing documents and interviewing resource persons in order to obtain accurate information related to the cases that occur at each station. In this study, focusing on the province of South Sulawesi, in the Makassar Pare Pare railway project, there are several flood and landslide events that have occurred and the most significant impact on the Train Travel Graph operation pattern and signaling system are in the case of floods at Maros station and landslides at KM 72 in the Mandalle and Tanete Rilau station areas. The incident resulted in the cessation of train operations and the disconnection of the railway operation line which was supposed to be the Mandai Garongkong line but was cut off and ended at Mandal station. This incident can finally be handled by turning off all component functions in the railway interlocking system in flood handling. By using gutters and gabions in the KM 72 area to minimize the occurrence of further landslides and the crossing method carried out on Fiber Optic cables to keep the cable away from the risk of landslides.

References

Agastya, A., & Imron, N. A. (2020). Perencanaan Bangunan Pengendali Sedimen Pada Jembatan Kereta Api Kota Madiun. Jurnal Perkeretaapian Indonesia (Indonesian Railway Journal), 4(1), 1–5. https://doi.org/10.37367/jpi.v4i1.118

Amri, S., Klimatologi, P. S., Tinggi, S., & Klimatologi, M. (2024). Analisis Dinamika Atmosfer Pada Kejadian Banjir , Tanah Longsor , dan Angin Kencang Di Semarang dan Demak Tanggal 13 Maret 2024. 10(1), 77–89.

Aptana, A., Arsyad, M. F., & Prasetyo, P. H. (2023). Analisis Perbandingan Sistem Persinyalan Konvensional Dengan CBTC Terhadap Headway Kereta Api. Jurnal Teknik Transportasi, 2(1), 68–85. http://dx.doi.org/10.54324/jtt.v2i1.7

Badwi, N., Baharuddin, I. I., & Abbas, I. (2020). Flood Hazard Level Mapping in Maros River Basin. La Geografia, 18(3), 309–322.

Baillie, P., & Decker, J. (2022). Enigmatic Sulawesi: The tectonic collage. Berita Sedimentologi, 48(1), 1–30. https://doi.org/10.51835/bsed.2022.48.1.388

Cyril Sumarahardhi, P., & Budhi Santoso, D. (2023). Identifikasi Dan Pemetaan Gangguan Komponen Sistem Persinyalan Pt Kereta Api Indonesia (Persero) Resort Karawang.

JATI (Jurnal Mahasiswa Teknik Informatika), 7(3), 1574–1578. https://doi.org/10.36040/jati.v7i3.6875

Fauzi. (2019). Hypertext Processor. Journal of Chemical Information and Modeling, 53(9), 1689–1699.

Hamzah, D., Sugiana, A., Rusdinar, A., Elektro, F. T., & Telkom, U. (2018). Sistem Pengendalian Kereta Api Saat Terjadi Bencana Banjir , Gempa Bumi Dan Tanah Longsor Railway Control System When Flood Disaster , Earthquake and. 5(3), 4257– 4264.

Indonesia Ministry of Transportation. (2017). Peraturan Menteri Perhubungan PM112/2017 tentang Pedoman dan Proses Perencanaan di Lingkungan Kementerian Perhubungan. Kemenhub, 13.

Legros, J.-P. (2012). Major Soil Groups of the World. In Major Soil Groups of the World. https://doi.org/10.1201/b12931

Menteri Perhubungan Republik Indonesia. (2018). PM 44 Tahun 2018 tentang Persyaratan Teknis Peralatan Persinyalan Perkeretaapian. Mentri Perhubungan Republik Indonesia, 13.

Moro, J. L., Rottner, M., Alihodzic, B., & Weißbach, M. (2008). Materie. Baukonstruktion - Vom Prinzip Zum Detail, 77–130. https://doi.org/10.1007/978-3-540-27917-4_5

Mukhlisa, A. N., Mappiasse, M. F., & Ashari, A. S. (2023). Penerapan Metode Skoring Dan

Weighted Overlay Dalam Menaksir Tingkat Kerawanan Longsor Kecamatan Camba, Kabupaten Maros. Gorontalo Journal of Forestry Research, 6(2), 89. https://doi.org/10.32662/gjfr.v6i2.3203

Nugroho, A., Suryono, T., Wibisono, I., & Saribanon, E. (2024). Penanganan Keadaan Khusus pada Operasi Kereta Api. Jurnal Ekonomi Manajemen Sistem Informasi, 5(3), 318–326. https://doi.org/10.31933/jemsi.v5i3.1833

Nur, V., Putri, A., Usman, K., & Kustiani, I. (2024). Analisis Tingkat Risiko Penyebab Rel Patah pada Jalur Kereta Api Wilayah Divre IV Tanjung Karang. 09(02), 283–292. https://doi.org/10.29244/jsil.9.2.283-292

Pandiangan, A. M. T., Hosang, J. R. ., & Septanto, D. (2019). Upaya Penanganan Pasca Longsor Lintas Purwokerto – Kutoarjo (Studi Kasus Km 423+100 Stasiun Ijo-Tambak). Jurnal Perkeretaapian Indonesia (Indonesian Railway Journal), 3(2), 146–152. https://doi.org/10.37367/jpi.v3i2.125

Prabowo, D., & Rahman, R. A. P. (2023). Identifikasi Potensi Banjir Di Kawasan Sub Urban Kota Semarang (Studi Kasus Kab Kendal). Jurnal Planologi, 20(1), 1. https://doi.org/10.30659/jpsa.v20i1.28223

Ramesh, G. (2021). Slope and Landslide Stabilization: A Review. Indian Journal of Structure Engineering, 1(2), 13–16. https://doi.org/10.54105/ijse.a1304.111221

Ridwan, M., Zainuddin, A., Kasim, M., & Yahya, M. (2022). Pemetaan Daerah Bencana Pada Destinasi Kota Palopo (Studi Kasus Bencana Banjir dan Longsor) (Disaster Space Mapping in Palopo City Destinations (Case Study of Flood and Landslide Disaster ). 16(1), 61–76.

Roy, S., & Mitra, S. (2020). Railway Stations of Tripura, India: An Assessment of Infrastructural Conditions. January 2020, 177–198. https://doi.org/10.1007/978-3-030- 23796-7_11

Santoso, B., Wijatmoko, B., & Supriyana, E. (2020). Identifikasi Bidang Gelincir Berdasarkan Parameter Fisika Batuan (Studi Kasus: Daerah Rawan Longsor Di Jalan Kereta Api Km 110, Purwakarta). Jurnal Ilmu Dan Inovasi Fisika, 4(2), 123–130. https://doi.org/10.24198/jiif.v4i2.27579

Sitorus, A. S., Sitorus, B., Sitorus, C. N., & Sitorus, T. I. (2022). Peran Sistem Kendali Berbasis Komunikasi dan Automatic Train Protection pada Kereta Perkotaan dan Jarak Jauh. Jurnal Perkeretaapian Indonesia (Indonesian Railway Journal), 6(1), 14–23. https://doi.org/10.37367/jpi.v6i1.192

Suhadi, S., Mabruroh, F., Wiyanto, A., & Ikra, I. (2023). Analisis Fenomena Perubahan Iklim Terhadap Curah Hujan Ekstrim. OPTIKA: Jurnal Pendidikan Fisika, 7(1), 94–100. https://doi.org/10.37478/optika.v7i1.2738

Wibawanto, B. S., Hapsari, J. P., Suprajitno, A., & Arifianto, T. (2022). Analisis Peralatan Persinyalan Kereta Api dengan Persinyalan Elektrik Silsafe4000 Di Stasiun Lempuyangan Yogyakarta. Jurnal Perkeretaapian Indonesia (Indonesian Railway Journal), 6(2), 42–48. https://doi.org/10.37367/jpi.v6i2.219

Wijayanto, H. (2019). Peranan Penggunaan Transportasi Publik di Perkotaan (Studi Kasus Penggunaan Kereta Commuterline Indonesia Rute Jakarta-Bekasi). Kybernan: Jurnal Studi Kepemerintahan, 5(2), 1–8. https://doi.org/10.35326/kybernan.v5i2.365

Zafira, A. P., Putra, H., Murdiono, J., & Arief, D. (2024). Analisis Tingkat Risiko Banjir dan Tanah Longsor di Jalur Kereta Api Makassar-Parepare. 2(3), 120–137.

Published

2025-05-07

How to Cite

Muhadzdzib, N., Hakim, M. L., Nugraha, N. T. P., & Darmawan, A. (2025). Analysis of the Impact of Landslides and Floods on Train Travel Graph Operation Patterns and Signaling Systems on the Mandai-Garongkong Line. Siber Journal of Advanced Multidisciplinary, 3(1), 17–35. https://doi.org/10.38035/sjam.v3i1.427